Elevated Construction Services https://elevatedcs.com/ Building Better. Leading the way in mass timber erection and specialized construction trade services Tue, 12 Nov 2024 15:41:59 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.1 https://elevatedcs.com/wp-content/uploads/2023/02/cropped-favicon@4x-32x32.png Elevated Construction Services https://elevatedcs.com/ 32 32 1345 Doolittle Drive https://elevatedcs.com/project-1345-doolittle-drive/ Thu, 07 Nov 2024 19:53:13 +0000 https://elevatedcs.com/?p=2347 Projects Award 2024 Concrete Innovations Award Client Location Trade Type Gallery Project Photos View more projects

The post 1345 Doolittle Drive appeared first on Elevated Construction Services.

]]>

1345 Doolittle Drive

Prologis is reducing its San Leandro industrial warehouse by 68,000 s.f., adding a new truck court, and renovating the remaining warehouse to add office space. Elevated is erecting an interior 4,900 s.f. cross-laminated timber (CLT) mezzanine and staircase within the existing structure. With exterior walls in place, Elevated strategized and collaborated with the crane company for careful and safe installation.
Award
Client

Bradley Concrete

Location

San Leandro, CA

Trade Type

Mass Timber

Gallery

Project Photos

The post 1345 Doolittle Drive appeared first on Elevated Construction Services.

]]>
Confidential Client Labs 600-650 Gateway https://elevatedcs.com/project-confidential-client-labs-600-650-gateway/ Thu, 07 Nov 2024 19:48:38 +0000 https://elevatedcs.com/?p=2336 Projects Client Location Trade Type Gallery Project Photos View more projects

The post Confidential Client Labs 600-650 Gateway appeared first on Elevated Construction Services.

]]>

Confidential Client Labs 600-650 Gateway

This project was a campus-wide renovation that included new heavy timber lobbies for three buildings and featured Halio glass entryways, and associated site work. Elevated led the mass timber erection and installed a range of accessories to protect the exposed wood from damage throughout the duration of the project.
Client

Confidential

Location

South San Francisco, CA

Trade Type

Mass Timber

Gallery

Project Photos

The post Confidential Client Labs 600-650 Gateway appeared first on Elevated Construction Services.

]]>
Davis Joint Unified School District Elementary Schools https://elevatedcs.com/project-davis-joint-unified-school-district-elementary-schools/ Thu, 07 Nov 2024 19:31:43 +0000 https://elevatedcs.com/?p=2327 Projects Client Location Trade Type Gallery Project Photos View more projects

The post Davis Joint Unified School District Elementary Schools appeared first on Elevated Construction Services.

]]>

Davis Joint Unified School District Elementary Schools

Elevated is installing a ready-frame modular system for new TK/Kindergarten classroom buildings at five locations within the Davis Joint Unified School District: Fred T. Korematsu Elementary School, Marguerite Montgomery Elementary School, Pioneer Elementary School, and Robert E. Willet Elementary School. The walls of these modular classroom buildings are being prefabricated by our team off-site, for enhanced production and safety, prior to being transported to the five campuses for installation, roof framing, and construction.
Client

Landmark Construction

Location

Davis, CA

Trade Type

Rough Carpentry

Gallery

Project Photos

The post Davis Joint Unified School District Elementary Schools appeared first on Elevated Construction Services.

]]>
Palo Alto Unified School District Hoover Elementary School Campus Replacement https://elevatedcs.com/palo-alto-unified-school-district-hoover-elementary-school-campus-replacement/ Thu, 07 Nov 2024 18:53:26 +0000 https://elevatedcs.com/?p=2315 Projects Client Location Trade Type Gallery Project Photos View more projects

The post Palo Alto Unified School District Hoover Elementary School Campus Replacement appeared first on Elevated Construction Services.

]]>

Palo Alto Unified School District Hoover Elementary School Campus Replacement

Palo Alto Unified School District’s Hoover Elementary School is undergoing a full campus replacement with the addition of four TimberQuestTM buildings and associated site work. Elevated is performing design-assist mass timber erection and roof installation for the new buildings totaling 55,000 s.f. In addition to the major structural components, Elevated is leading the installation of three exterior canopy systems, playground accessories, and detailed interior casework for cabinets, drawers, and desks. Our skilled craftspeople are also constructing the stage for the school’s new MPR building.
Client

XL Construction

Location

Palo Alto, CA

Trade Type

Mass Timber

Gallery

Project Photos

The post Palo Alto Unified School District Hoover Elementary School Campus Replacement appeared first on Elevated Construction Services.

]]>
Calistoga Junior-Senior High School STEM Building https://elevatedcs.com/project-calistoga-junior-senior-high-school-stem-building/ Thu, 07 Nov 2024 18:03:06 +0000 https://elevatedcs.com/?p=2292 Projects Client Location Trade Type Gallery Project Photos View more projects

The post Calistoga Junior-Senior High School STEM Building appeared first on Elevated Construction Services.

]]>

Calistoga Junior-Senior High School STEM Building

Elevated is currently providing wood framing installation services for a new single-story STEM classroom building at Calistoga Junior-Senior High School, which will house ten classrooms, a workroom, restrooms, and surrounding site work. For enhanced efficiency and safety on the jobsite, our team is prefabricating the wood framed walls on-site prior to the erection of the 15,000 s.f. school building.
Client

Landmark Construction

Location

Calistoga, CA

Trade Type

Rough Carpentry

Gallery

Project Photos

The post Calistoga Junior-Senior High School STEM Building appeared first on Elevated Construction Services.

]]>
Confidential Client Mass Timber Campus B Siding https://elevatedcs.com/confidential-client-mass-timber-campus-b-siding/ Mon, 26 Feb 2024 21:38:55 +0000 https://elevatedcs.com/?p=2150 Projects Client Location Trade Type Gallery Project Photos View more projects

The post Confidential Client Mass Timber Campus B Siding appeared first on Elevated Construction Services.

]]>

Confidential Client Mass Timber Campus B Siding

Elevated executed the design-build installation of 30,000 s.f. of wood siding and soffits as part of their architectural carpentry scope of work. During preconstruction, Elevated proposed an alternate, cleaner siding system that has proved to be faster to install. Notably, the unique siding employs a sophisticated tongue-and-groove system, along with a grad rail clip-in mechanism for securing the wood siding.
Client

XL Construction

Location

Sunnyvale, CA

Trade Type

Rough Carpentry

Gallery

Project Photos

The post Confidential Client Mass Timber Campus B Siding appeared first on Elevated Construction Services.

]]>
Stratford School TimberQuest™ Stoneridge Campus Expansion https://elevatedcs.com/stratford-school-timberquest-stoneridge-campus-expansion/ Tue, 16 Jan 2024 22:00:49 +0000 https://elevatedcs.com/?p=2000 Projects Client Location Trade Type Gallery Project Photos Previous image Next image View more projects

The post Stratford School TimberQuest™ Stoneridge Campus Expansion appeared first on Elevated Construction Services.

]]>

Stratford School TimberQuest™ Stoneridge Campus Expansion

Elevated led the mass timber erection of a new seven classroom TimberQuest™ building on an existing campus, including a combination of CLT and Glulam walls and roofing. The exterior walls were clad with water resistant barriers, insulation, and cementitious siding surrounded by flashings and break metals. Elevated completed the interior framing of partition walls for new classrooms, restrooms, and teacher lounges and installed millwork. Elevated also provided rough carpentry services, including mechanical curbs, duct penetration framing, and the installation of a new roof screen.
Client

XL Construction

Location

Pleasanton, CA

Trade Type

Mass Timber

Gallery

Project Photos

The post Stratford School TimberQuest™ Stoneridge Campus Expansion appeared first on Elevated Construction Services.

]]>
County of San Mateo Temporary Navigation Center https://elevatedcs.com/county-of-san-mateo-temporary-navigation-center/ Tue, 16 Jan 2024 21:30:53 +0000 https://elevatedcs.com/?p=1981 Projects Awards ENR CA 2023 Best Projects Award of Merit in the Government/Public Building category ENR CA 2023 Best Projects Award of Merit – Excellence in Sustainability category ENR CA Best Level 2023 Best Projects Award Excellence in Safety category Client Location Trade Type Gallery Project Photos Previous image Next image View more projects

The post County of San Mateo Temporary Navigation Center appeared first on Elevated Construction Services.

]]>

County of San Mateo Temporary Navigation Center

Elevated provided rough carpentry services for a new, state-of the art, 240-bed Navigation Center that serves the homeless or at-risk residents of the County of San Mateo. Elevated supplied and installed Ceraclad siding at the dining hall, community building, and two three-story, stand-alone elevator towers. They supplied and installed 13,600 s.f. of Dasso decking throughout three multi story buildings and installed exterior aluminum flashing at each unit’s adjoining walls. In addition, Elevated provided roof curb framing at the dining hall and community buildings and completed millwork and cabinet installation for over 160 units. The project also included wood cladding for a smoking shelter and Elevated furnished and installed shade sails throughout the campus.
Awards

ENR CA 2023 Best Projects Award of Merit in the Government/Public Building category

ENR CA 2023 Best Projects Award of Merit – Excellence in Sustainability category

ENR CA Best Level 2023 Best Projects Award Excellence in Safety category

Client

XL Construction

Location

Redwood City, CA

Trade Type

Rough Carpentry

Gallery

Project Photos

The post County of San Mateo Temporary Navigation Center appeared first on Elevated Construction Services.

]]>
Phase 3 Genesis Station https://elevatedcs.com/phase-3-genesis-station/ Tue, 16 Jan 2024 21:15:23 +0000 https://elevatedcs.com/?p=1973 Projects Client Location Trade Type Gallery Project Photos Previous image Next image View more projects

The post Phase 3 Genesis Station appeared first on Elevated Construction Services.

]]>

Phase 3 Genesis Station

Elevated provided building and site specialties services for this conversion of an existing 400,000 s.f. Class-A, nine-story office building to one that supports life science tenants. This included furnishing and installation of fire extinguishers and fire extinguisher cabinets, fiber reinforced plastic, corner guards, toilet accessories, and toilet partitions.
Client

XL Construction

Location

Daly City, CA

Trade Type

Building & Site Specialties

Gallery

Project Photos

The post Phase 3 Genesis Station appeared first on Elevated Construction Services.

]]>
Phase 3 1400 Fashion Island https://elevatedcs.com/phase-3-1400-fashion-island/ Tue, 16 Jan 2024 19:55:57 +0000 https://elevatedcs.com/?p=1955 Projects Client Location Trade Type Gallery Project Photos Previous image Next image View more projects

The post Phase 3 1400 Fashion Island appeared first on Elevated Construction Services.

]]>

Phase 3 1400 Fashion Island

Elevated provided building and site specialties services for this conversion of an existing, partially occupied, 175,000 s.f., 10-story office building to a mixed office and life science laboratory space. This included furnishing and installation of fire extinguishers and fire extinguisher cabinets, fiber reinforced plastic, corner guards, toilet accessories, and toilet partitions.
Client

XL Construction

Location

San Mateo, CA

Trade Type

Building & Site Specialties

Gallery

Project Photos

The post Phase 3 1400 Fashion Island appeared first on Elevated Construction Services.

]]>